CONVERSION
INSTRUCTIONS
.
Put the new orifice into the orifice removal
tool (B), and then insert the tool into the
burner opening and tighten the new orifice
into the valve.
Repeat this step for all three burners.
Make sure you are using
the correct
orifice,
which
is marked
"1.37".
(Fig. 48)
.
Rotate the air shutter opening from the
LP setting to the NG setting.
LP: 1/4" open
NG: 1/6" to 1/8" open
(Fig. 49)
Air shutter opening to adjust
Fig. 49
1
Searing
Burner Conversion
1.
Loosen the ignition pin screws at the front of
searing burner. Remove
screws at the back
of searing burner to detach it from bracket.
Then lift the burner while sliding it out of firebox.
(Fig. 50)
.
Insert the provided
orifice removal tool (B)
into the burner opening and unscrew
orifice
from end of valve.(Fig.
51)
I
Loosen
Orifice
Fig. 50
23
Fig. 51