CONVERSION
INSTRUCTIONS
,
Put the new orifice into the orifice
removal tool (B), and then insert the tool
into the burner opening and tighten the new
orifice into the valve.
Repeat this step for all five burners.
Make sure you are using
the correct
orifice,
which
is marked
"1.37".
(Fig. 17)
,
Rotate the air shutter opening from the
LP setting to the NG setting.
LP: 1/4" open
NG: 1/6" to 1/8" open
(Fig. 18)
I
Air shutter opening to adjust
Fig. 18
I
Side Burner Conversion
1. Remove 2 screws (5/32-32x3/16
in.) from
the end of the side burner valve. (Fig. 19)
Fig. 19
5/32-32x3/16
in. screw
,
Use a wrench to remove the orifice
between
the side burner hose and the
orifice nut. (Fig. 20)
Orifice
Hose
Orifice nut
Fig. 20
11