6
Assembly
6.1
Safety information
›
Assembly may only be carried out by trained, qualified personnel.
›
Abide by the system-related conditions and requirements of the system manufacturer or plant constructor.
›
Safety elements, e.g. protective grids, may not be dismantled, circumvented or put out of function.
6.2
Preconditions for assembly
•
Place of installation protected against dust, moisture and influences of the weather.
•
The installation position is unimportant, the Multibox can be installed both horizontally and also vertically, likewise the blow-out
direction can be changed on site.
•
Only to be positioned outside with a weather-protection roof (accessory).
•
When assembling the MUB/T, please make sure that the there is enough space for the installation of the unit
(important at motor side, in case a motor or impeller requires replacement, see Fig. 10).
Fig. 10: MUB/T Preconditions for assembly (motor side)
6.3
Assembly
NOTE
The fan may only be lifted by the base frame when unpacking it.
Do not distort the housing of the Multibox in installation.
"
Pay attention to the throughflow direction (arrows).
"
Ensure secure access to the Multibox for maintenance and repairs.
"
Provide for contact and suction protection and safety distances pursuant to DIN EN 294 and DIN 24167-1.
"
Guarantee uninhibited and even flowing into the device and free blowing-out.
"
6.3.1
Floor assembly
Fit the base frame on a level, flat surface.
"
Close the contact surface between the base frame and plinth or floor with cellular rubber or with a cellular material tape.
"
Fit the air connection lines and the accessories.
"
6.3.2
Wall and ceiling assembly
WARNING
Hazard from falling parts
›
Check the base (wall/ceiling) for strength before assembly.
›
When selecting the fitting material, pay attention to weight, tendency to vibrate and tensile forces (weight informa-
tion on the name plate).
Fit the Multibox on a firm base with suitable fitting material.
"
Fit the air connection lines and the accessories.
"
41