Zenner zelsius C5-IUF Instrucciones De Instalación Y Funcionamiento página 22

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
Simple example of the display menu
Level 1
Heat energy
(Main display)
1
Cooling energy
1
2
3
Segment test
1
Date last due date
1
Heat energy at last due date
1
Cooling energy at last due date
Volume
Flow rate
Supply temperature
Return temperature
Temperature dif-
ference
Current power
S
Depending on your meter's model its displays can differ in number and order
from those shown here.
After choosing a display position different to the main display and no operation
of the push button within approx. 2 minutes, the meter returns automatically to
the main display.
22
H
Level 2
2
Heat energy difference from
last due date to now
2
Cooling energy difference from
last due date to now
Heat energy difference from
1. of this month to now
2
Cooling energy difference from
1. of this month to now
2
Volume difference from 1. of
this month to now
2
Maximum flow rate
2
Maximum monthly flow rate
2
Maximum heating power, average value
since commissioning
2
Maximum monthly heating power
2
Maximum cooling power, average
value since commissioning
2
Maximum monthly cooling power
S
H
loading