Pfannenberg PTF Serie Instrucciones De Servicio página 65

Ventiladores con filtro superiores / filtros de escape superior 230 / 115 v
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 162
ENG
4.5.3
PTF 1200
30 mm
Fig. 9: Assembly cut-out/assembly
NOTE
The general tolerances in accordance with ISO 2768-1, tolerance class "m" apply.
Prerequisites
DANGER – Danger to life due to electric shock. Make sure that the unit is voltage-free.
All general requirements are met, see "General", Page 22.
Required tools and materials
Saw
Switch cabinet mill if necessary
Drill 6.5 mm
Protective covers
Procedure
1.
Ensure that the switch cabinet has a protective cover to protect against chips.
2.
Prepare the cut-out according to Fig. 9.
To ensure IP protection category IP54, the cutting edges must be straight and the maximum bending of the switch
cabinet must be 1 mm.
3.
Remove burr from cutting edges.
4.
Remove chips and assembly waste from the switch cabinet.
5.
Place the top filterfan onto the cut-out and screw it to the switch cabinet.
The unit is now assembled and can be connected electrically.
Operating Manual | Top Filterfans / Top Exhaust Filter | – 230 / 115 V | 086150000
229 mm
185 mm
G00103
25/40
loading