Craftsman 247.240193 Manual Del Operador página 13

Idiomas disponibles

Idiomas disponibles

2
3
Figure 20
Note: On decks without deck wheels, hook the retainer strap into the hole
provided in the flange on the front-side of the cutting deck. See Figure 21.
2
Figure 21
Note: When assembling this bagging unit on an older deck, an extra wing
knob, which is only needed on installations on new decks, will be left over.
ASSEMBLY AND INSTALLATION
1
1
3
Installing the Upper Chute Tube
1.
Peel the backing off of the self-adhesive foam strip (721-04388) that has
been included within your Contents of Carton. Apply it to the upper chute,
flush against the flange as shown in Figure 22.
Flange
2.
With the grass catcher cover open, install the upper discharge chute through
the discharge chute opening, as seen in Figure 23.
13
Figure 22
Figure 23
loading