Maxeon SunPower Reserve Instrucciones De Instalación página 71

Sistema de almacenamiento de energía para el hogar
Ocultar thumbs Ver también para SunPower Reserve:
Idiomas disponibles
  • ES

Idiomas disponibles

13.0 Appendix 2: Regional Application Standard
Please check with your local grid company and choose the correspond Regional Application
Standard, the power quality modes Volt-VAR and Volt-Watt will be running automatically. (Only
for regions with AS/NZW 4777.2 safety regulations).
Country (DNSP)
Ausgrid, Ausnet, Citipower,
Endeavour Energy, Energex,
Ergon, Essential Energy,
Evoenergy, Jemena, SA Power
Networks, PowerCor, United
Energy
Western Power
Horizon Power and
TasNetworks
New Zealand
Germany
Italy
Spain
Belgium
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
Safety standard
AS/NZS 4777.2: 2020
AS/NZS 4777.2: 2020
AS/NZS 4777.2: 2020
AS/NZS 4777.2: 2020
VDE4105/11.18
CEI 0-21
RD1699/UNE
C10/C11
Region Setting
Australia A
Australia B
Australia C
New Zealand
Germany
Italy
Spain
Belgium
70
loading

Este manual también es adecuado para:

Reserve-inv-1-p5-l1-intReserve-bat-1-dc-10.1-int