6.6. Mounting the Battery and Inverter Facade
After finishing electrical connection of the energy storage system, do the following operations.
Instructions:
1.
Mounting the side plates of the battery
2. Install the top cover of the inverter
1.
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
3
4
5
√
1
2
1
2
2.
3
Pull with hand
46