LF PROJECT SOURCE PS WCA JET WALK IN 60IN RH GT-6037WRH Manual Del Usuario página 12

Idiomas disponibles

Idiomas disponibles

PREPARTION BEFORE INSTALLATION
WARNING:
The safe distance between the power supply and the water supply is not less than 2". And the power supply is located above the water
supply.
Parts containing live parts must be inaccessible to a person in the bath.
Earthed appliances must be permanently connected to fixed wiring.
Parts incorporating electrical components, except remote control devices, must be located or fixe so that they cannot fall into the bath.
Please do not use other power, except specified power. Or it may cause fire or electric shock.
Do not use the broken power supply, power plug or the loose socket. Or it may cause fire or electric shock.
Do not modify the power supply cord, use it with an extension cord or combine it with other equipment using multiple plugs. Doing so
could lead to chocks, overheating or fire.
The power need to connect to terminal box, and it must be operated by a qualified electrician.
INSTALLATION INSTRUCTIONS
A. Flush all water supply lines of debris
Before connect bathtub water inlet pipe, first open water valve for a period of time to clean the debris from the pipe. Make sure that the debris will
not enter the bathtub pipe. So that we can effectively extend the life of the fitting.
B. Remove access panel
Temporarily remove all access panels. Part of the process of the installer can be more convenient to install through the access window.
C. Leveling the adjustable feet
1. Feet are extended for shipping purposes to provide clearance and protection of the front of tub. The tub should be reset by installer to proper
height required to level the tub.
2. Raise the four center feet so that tub rests only on the four corner feet.
3. Raise the corner feet to lower tub to desired height and level tub in both directions.
4. Verify bathtub level and lock the four corner feet in position.
5. Lower the four center feet so they firmly contact the floor and tighten in place.
6. When finished, tighten the nuts of the adjustable feet to fix the height of the bathtub.
D. Connect the water supply
For ease of use, our bathtub is equipped with stainless steel cold and hot hoses (connector 1/2", Packaged with faucet kit).
Please connect the cold and hot water hoses to the bathroom's cold and hot water hoses accordingly.
Note: The specification of the water inlet hose is 1/2". If there is no reserved 1/2" water inlet connector, please use a 3/4"
to 1/2" adapter shown (not included).
E. Connect the drain kit
The bathtub has a drain assembly installed and water tested. Follow the illustration to connect the drain assembly to the house's sanitation system.
2" PVC Elbow
Installed
Not Supplied
2" PVC Hose
P-Trap
Hubless Coupling
12
loading

Productos relacionados para LF PROJECT SOURCE PS WCA JET WALK IN 60IN RH GT-6037WRH

Este manual también es adecuado para:

5144544