Tannoy CVS EN 54 Serie Manual De Instrucciones página 8

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
14
CVS (EN 54) Series
5. Accessories
Standard Accessories
C-Ring
Paint Mask
Optional Accessories
Plaster (Mud)
Ring
6.1. Installation Guide for Suspended Ceilings
Tile bridge kit
Note: A tile bridge kit
must always be used
when installing into
1. Remove the ceiling tile from its frame and place it on a flat surface. Mark the cut-out area on the ceiling
suspended ceiling tiles
tile by tracing around the template provided. (Fig.1)
Cut-out template
2. Cut out the hole in the ceiling tile using a circular saw or pad saw. (Fig.2)Place the C-ring and tile-bridge on
top of the ceiling panel, aligning the C-ring over the hole, and screw the C-ring to the tile bridge using the
fixings provided. (Fig.3)
3. Slide the speaker assembly through the hole and turn the screws on the front of the speaker to extend the
mounting wings. Tighten the screws until a firm grip is achieved.
If using a power driver, Tannoy recommends a torque setting of 1.5 Nm. (Fig.4)
DO NOT OVERTIGHTEN!
4. Slide the tile panel back into the suspended ceiling. The tile bridge ends will catch over the railings,
supporting the weight of the speaker. (Fig.5)
5. Connect a Secondary Support Line to safety tab. Some construction codes require use of this secondary
support point, which should connect to a separate secure support point using a suitable support line.
Consult construction codes in your region.
Go to section 7 for instructions on wiring and set-up instructions.
15
Quick Start Guide
Fig.1
Fig.2
Fig.3
Fig.4
Fig.5
loading

Este manual también es adecuado para:

Cvs 6 en 54Cvs 4 en 54Cvs 6 micro en 54