WIKA PEW-1 Serie Manual De Instrucciones página 15

Idiomas disponibles

Idiomas disponibles

4. Commissioning, operation
330
300
270
10 dB
20 dB
30 dB
240
210
Information on the installation of the receiving gateway
Position the gateway in such a way that the transmission power of model PEW-1000 is optimally utilized. For this, the
following recommendations should be observed:
Depending on the application, a gateway for indoor or outdoor use should be selected.
The radiation characteristics of the antenna should be taken into account when positioning the gateway.
If the sensors are located on one level, vertical mounting of the LoRaWAN
recommended. The location should ideally be in the middle of the area to be covered.
If the sensors are located on several levels, the gateway should be placed in the middle of the building and the
gateway antenna should be aligned horizontally.
Another option is to place the gateway outside the building and align the antenna vertically. In this way, a sufficient
radio connection can be established from the outside to several floors.
In outdoor areas, ensure that the gateway is mounted at a sufficient height and is not covered by anything in the
immediate vicinity. The higher the gateway is positioned, the further the LoRaWAN
WIKA operating instructions, models PEW-1000 and PEW-1200
0
30
40 dB
150
180
Horizontal polarisation, x-z plane
Vertical polarisation, x-y plane
60
90
Y
120
®
antenna on the gateway is
®
Z
X
connection reaches.
EN
15
loading