SONNIGER CR ONE Operación Y Mantenimiento página 5

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
Operation and maintenance documentation HEATER CONDENS EC v202301
While drilling the holes in marked places be careful not to damage the coil by going deeper than 20mm!
To sustain proper functioning of the device keep a safe distance– 200 mm from its sides and 300 mm from its
backside (from the fan)
Mounting bracket to the heater
The bracket set consists of a holder, two sleeves, two
M8 screws, and washers. To mount the bracket, drill
two Ø12-13mm holes in places visibly marked on the
casing. Insert sleeves into drilled holes and place the
bracket in. The included holder must be screwed with
M8 screws with washers.
Installation of mounting pins
To mount the heater to the ceiling, use M8 mounting
pins. Drill two Ø8-9mm holes in places visibly marked on
the casing. Mounting pins may be screwed into the
frame not deeper than 20 mm
ATTENTION !
Assembly of HEATER MIX air mixer
To mount the HEATER MIX air destratifier to the ceiling,
use M8 mounting pins. Drill two Ø8-9mm holes in places
visibly marked on the casing. Mounting pins may be
screwed into the frame of a heat exchanger to a maxi-
mum depth of 20 mm. Mounting pins and connecting el-
ements are not included in the unit
NOTICE !
loading

Este manual también es adecuado para:

Cr1Cr2Cr3Cr2 maxCr3 maxCr4 max