Tectro R233TC-2 Instrucciones De Uso página 87

Ocultar thumbs Ver también para R233TC-2:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
15
17
5/16"
19
STEP 17
STEP 19
21
23
STEP 21
25
STEP 23
27
16
18
STEP 16
20
STEP 18
22
STEP 20
STEP 20
24
STEP 22
26
15. Reposition 4 wing nuts on the mounting stud, but do
not tighthen them.
16. Raise the wick to its highest position and tighten the
wing nuts in several steps.
17. Check the wick height. It should be 5/16 inch above the
collar.
18. Check for the correct clearance between wick holder
and draft tube. It should be the same all around.
19. Reinstall the tip-over switch assembly by pushing the
extinguish knob .
20. Check the function of the tip-over safety stop by push-
ing the extinguish button  to activate the pendulum.
21. Reinstall the automatic ignition assembly.
22. Reinstall the wind cover A / B.
23. Reinstall the lamp cover K.
24. Reinstall the cabinet .
25. Tighten the 5 screws on the cabinet and reinstall the
sensor at the back of the cabinet .
26. Reinstall the combustion chamber 4 and the fuel tank
.
27. Reinstall the wick adjusting knob 2 and ignition
button 3. Close the front plate.
Install the batteries in the battery case and fill the fuel tank
with Premium Quality Fuels. Put the tank into the heater
and wait at least 180 minutes for the new wick to fully satu-
rate with the fuel.
4
87
87
loading