probst VTK-V Instrucciones De Uso página 38

Ocultar thumbs Ver también para VTK-V:
Idiomas disponibles
  • ES

Idiomas disponibles

Operation
5
Operation
5.1
Loads on firm ground
1. Move the VTK-V carefully to the
load.
4. Take the VTK-V by the handles ,
bring it in horizontal position and
carefully transport the load to place of
destination.
7. The VTK-V can now be moved
away.
51100015
2. Bring the stop and the bottom plate
in position by placing the VTK-V in
the upright position.
5. At place of destination, bring the
VTK-V carefully in the upright
position.
13 / 17
3. Engage the lever up to the stop
clockwise, so the load is getting
clamped.
6. Rotate the lever counterclockwise
to release the load.
GB
loading