4.3 Trial operation
Leakage test
A
1.
Open the shut off valve A completely by turning
counterclockwise.
2.
Check for any water leakage on the connection hoses, tighten if
necessary.
Connecting the power plug
1.
Read and follow the safety information regarding electrical safety,
® 2.1 Safety information, page 6 .
2.
Connect power plug to a suitable power source.
1590625-A
WARNING!
Electric shock hazard
– Do not turn over or move the unit after power
connection.
3.
If the power indication light is not turned on after the power
plug connection, press any button except HI/LO, FR/BK buttons
of the remote control, then power goes on.
Checking the key functions
B
C
A
Setup
15