Volvo Penta EVC-C Instrucciones De Montaje página 9

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
Installation example (throttle control only)
Main helm station
1. Connect Throttle IN to pin 1 (+) and pin 2 (-).
IMportant! The interface always requires
power supply and a correct throttle signal -
4.0–20.0 mA, before "power up" of the EVC-
system.
note!
The system also requires an input signal
for gear indication.
Pin 12: - Negative
Pin 11: No connection
Pin 10: CLOSED : Output (7-8)
Pin 9: OPEN : Input (1-6)
Pin 8: - Slip out 4-20 mA (200-600 ohm)
Pin 7: + Slip out 4-20 mA (200-600 ohm)
Pin 6: - Slip 4-20 mA (200 ohm)
Pin 5: + Slip 4-20 mA (200 ohm)
Pin 4: REV 10-28 VDC =gear indication
Pin 3: FWD 10-28 VDC = gear indication
Pin 2: - Throttle 4-20 mA (200 ohm)
Pin 1: + Throttle 4-20 mA (200 ohm)
- Negative
+ 10-28 VDC
NEUTRAL SWITCH
"OPEN" IN NEUTRAL
(+) 10-28 VDC
- THROTTLE IN (200 ohm)
+ THROTTLE IN 4-20 mA
(+) 10-28 VDC
NOTE!
If a manual/mechanical emer-
gency gear control on gearbox
is installed (type as TD). The
"neutral switch" for "crank
disable" function shall also be
installed. ("open" in neutral).
loading

Productos relacionados para Volvo Penta EVC-C

Este manual también es adecuado para:

38862313886232