KNF Labor N035.18 Manual De Instrucciones página 80

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 138
Servicing
36
14. Check for smooth operation when turning the flywheel (J).
15. For two-headed pumps:
Perform work steps 3 to 14 on the second pump head.
16. Fasten the cover (H) with the 4 cheese head screws (G).
17. For two-headed pumps:
Pull the hose of the pneumatic connection back onto the
hose connector and tighten the union nut.
For pumps N 035.1.2 A_.18, this refers to both pneu-
matic connections.
Translation of Original Operating Instruction, KNF 121228-121397 04/23
Diaphragm pump N035.18
loading