WIKA RLT-1000 Manual De Instrucciones página 13

Ocultar thumbs Ver también para RLT-1000:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Commissioning, operation
If the opening of the process connection is too small for the float, the
float must be removed before mounting.
- Before removal, mark the position of the float stop  with a
waterproof pen
- Mark the mounting position of the float (e.g. "Up")
- After the level sensor has been mounted, the float should be
re-attached within the inside of the tank (pay attention to the
mounting position!).
- Secure the float stop  again at the marked point.
WIKA operating instructions models RLT
≤ 30°
EN
13
Tabla de contenido
loading

Este manual también es adecuado para:

Rlt-2000Rlt-3000

Tabla de contenido