Eaton Powerware APS6-300 Serie Guía De Instalación Y Funcionamiento página 160

Access Power Solutions Installation Guide (APS6-3xx Series)
Prueba
Procedimiento de prueba
Set the Battery Test Interval to 0 days.
Battery Test
Set the Battery Test Duration to 30 minutes
Set the Battery Test Termination Voltage to a value approximately
2 volts below the float voltage.
Connect load to the system.
Start the Battery Test.
Ensure the SC200 indicates that a Battery Test has started.
Wait until the system voltage reduces below the Termination
Voltage.
Confirm the Battery Test fails.
Ensure the Battery Test Fail alarm is displayed on the SC200.
Ensure the Battery Test stops and the system voltage returns to
the float voltage setting.
Clear the Battery Test Fail alarm in DCTools/Web.
Set the Battery Test Duration to 1 minute.
Set the Battery Test Termination Voltage to a value approximately
10 volts below the float voltage.
Connect load to the system.
Start the Battery Test.
Ensure the SC200 indicates that a Battery Test has started.
Wait for the Battery Test Duration time to expire.
Confirm the Battery Test passes.
Ensure the Battery Test stops and the system voltage returns to
the float voltage setting.
Reset the Battery Test settings to the original values.
Copyright © 2007 Eaton Corporation. Quedan reservados todos los derechos.
152
IPN 997-00012-60A
Agosto de 2007
Ajuste
None
loading