energies Lyon Instrucciones De Instalacion Y Uso página 58

Idiomas disponibles

Idiomas disponibles

1
2
5
6
Connect to top
Upon provision, the connection is fitted at the back,
therefore you need not install a cover on the back.
Because of the distance to the (combustible)
wall, the protection plate may not be removed in the
back shield.
1. Apply supplied fibre glass sealing tape (3) meas-
uring 10 x 3 mm to the contact surface of the con-
nection collar (2).
2. Attach the connection collar to the top plate with
the materials supplied.
Energies se reserva el derecho de realizar cambios por razones técnicas.
3
4
7
2
8
9
10
09-20008-006
Preparing the outside air
connection
If the appliance is installed in a room without sufficient
ventilation, you can install the connecting kit on the
appliance for the supply of outside air.
The air supply tube is 100 mm in diameter. If using a
smooth tube, it may be no longer than 12 metres long.
If accessories such as bends are used, the maximum
length (12 metres) must be reduced by 1 metre for
each accessory used.
Outside air connection via the wall
1. Make an opening in the wall (see the appendix,
2. Close the air connection hermetically to the wall.
Installing and connecting
1. Position the stove in the correct place, and make
2. Connect the appliance airtight to the flue (chim-
"Measurements", for the correct position of the
opening).
sure it is level.
ney).
1
2
3
4
5
09-20008-007
10
loading

Productos relacionados para energies Lyon