Mercedes-Benz M+P-03F-9928 Instrucciones De Instalación página 18

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
Fitting the outer cover
3
Screw (21) is installed in cover (3) on delivery.
Remove screw (21) from cover (3).
Insert cover (3) in the housing at the top and swing
it down.
Fasten cover (3) in place with screw (21).
Establish the power supply.
Configuring the wallbox
The wallbox must be connected to the Internet before
it can be configured.
The information on adhesive label (12) is required for
configuring the wallbox.
Download the EVBox-Install app on e.g. your
smartphone or tablet.
Follow the instructions in the app to configure the
wallbox.
- The maximum permitted current intensity is set within
the EVBox Install app. Ensure that the setting in the app
corresponds to the permitted current intensity for the
domestic electrical installation.
You can find information on the LED wallbox display in
the operating instructions.
Licence information
-The FOSS licence information is either included in the
scope of delivery on a mini-CD or, from June 2022,
saved to the wallbox.
To call up the licence information from the wallbox,
connect your smartphone to e.g. the Wi-Fi hotspot for
the wallbox. The station ID needed for logging on and
the -Wi-Fi password can be found on adhesive
label (12). Once the connection has been established,
enter the web address "http://192.168.123.4" in the
web browser to display the licence information.
Testing the installation
Perform all the tests on the wallbox that are prescribed
21
for the installation site.
These include:
M+P-03F-9929
Continuity of the protective earth connections
Insulation resistance
Loop impedance
Voltage drop
Tripping current and tripping time of the residual
current circuit breaker
Phase sequence
Further tests as per the local regulations.
M+P-03F-9939
- 15 -
loading