Recommended Grounding Method; Installation Instructions; Step 1 - Unpack Range Hood - Haier HCH2400ACB Manual Del Usuario

Campana de cocina de 24” y 30” con inclinación
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

A copy of the above code standards can be obtained from:
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
CSA International
8501 East Pleasant Valley Road
Cleveland, OH 44131-5575
It is important to make sure you have the proper electrical connection.

RECOMMENDED GROUNDING METHOD

A 120 volt, 60 Hz, AC only, 15-amp fused, grounded electrical supply is required. Use
an outlet that cannot be turned off by a switch. Do not use an extension cord.
NOTE: Before cleaning, or removing a light bulb, turn vent hood off, and then
disconnect the vent hood from the electrical source. When you are finished,
reconnect the vent hood to the electrical source.

INSTALLATION INSTRUCTIONS

Disconnect power before installing unit.
Failure to do so can result in death, fire, or electric shock.

STEP 1 - UNPACK RANGE HOOD

1. Select a flat surface for assembling the range hood and cover the surface.
Use two or more people to move and install range hood.
Failure to do so can result in back or other injury.
2. Using two or more people, lift the range hood assembly onto the covered
surface.
WARNING
Electrical Shock Hazard
WARNING
Excessive Weight Hazard
9
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hch3400acb

Tabla de contenido