6. INSTALLATION
Installation must be carried out by skilled and qualified personnel in compliance with the regulations in force.
6.1 Preliminary checks
The following principles must be followed in addition to the functionality:
1_ before installing the bar, make sure that the area above the bar is free of all obstacles (balconies, cables, trees, etc.)
2_ a good visibility at a sufficient distance to avoid collision (pay attention to bushes, etc.)
3_ suitable base to guarantee the secure positioning of the barrier
4_ absence of pipes and/or electrical cables that could be damaged when preparing the site
5_ minimization of the length of the electrical cables that are necessary to operates the barrier
6_ positioning in accordance with the present national standards.
6.2 Automation base preparation
4
3
1
3
2
B
Fig.4
A
4
9
8
Create a rectangular, suitably sized floor slab (A pic.4) with the ho-
les for the exiting cables. Use the foundation counterplate (B pic. 4),
with the 4 anchors supplied to be buried in concrete; or, once the
floor slab is completed, fix the cabinet to the barrier with 4 M10x120
foundation plugs (C pic. 4). The slab thickness must be at least 10cm
and can be increased as required.
17
6
5
7