Enlaces rápidos

CORNER SINK BASE CABINET |
GABINETE DE BASE DE FREGADERO ESQUINADO
ASSEMBLY & INSTALLATION INSTRUCTIONS |
INSTRUCCIONES DE ENSAMBLAJE E INSTALACIÓN
*ACTUAL SIZE
*TAMAÑO REAL
Install plastic brackets (BR) on diagonal
1
back panel (DBP). Brackets are not pre-
drilled. Install screws directly through the bracket
into the panel.
Instala los soportes plásticos (BR) en el panel trasero
diagonal (DBP). Los soportes no están pretaladrados.
Instala los tornillos directamente en el panel, a través
del soporte.
KC2
2x
(DBP)
2x
S2*
4x
BR
WD*
6x
8x
Install the diagonal back panel (DBP) to the
2
bottom panel (BP).
BR
2x
Instala el panel trasero diagonal (DBP) en el panel
inferior (BP).
U180736 | 12-21
S7*
14x
S7*
2x
S2*
24x
loading

Resumen de contenidos para HAMPTON BAY U180736

  • Página 1 CORNER SINK BASE CABINET | GABINETE DE BASE DE FREGADERO ESQUINADO U180736 | 12-21 ASSEMBLY & INSTALLATION INSTRUCTIONS | INSTRUCCIONES DE ENSAMBLAJE E INSTALACIÓN *ACTUAL SIZE *TAMAÑO REAL Install plastic brackets (BR) on diagonal Install the diagonal back panel (DBP) to the back panel (DBP).
  • Página 2 Lay the cabinet on its back. Install the Install the two shorter side panels (SBP) to toe-kick plate (TK) to the side panels with the bottom panel. brackets. Secure the diagonal back panel (DBP) to (S7) (S7) the side panels (SBP). Press the cams (KC2) into (S7) (S7) (DBP)
  • Página 3: Importante

    Carefully set the cabinet upright and secure Important health notice: Some of the building materials used in this home (or these building materials) emit formaldehyde. Eye, the face frame (FC) with the brackets (BR). nose, and throat irritation, headache, nausea and a variety of asthma- like symptoms, including shortness of breath, have been reported as a result of formaldehyde exposure.
  • Página 4 STEP 1: CABINET INSTALLATION | Select hardware that is best suited 36" 36" for your wall type* INSTALACIÓN DEL GABINETE | Selecciona los herrajes que mejor se adapten a tu tipo de pared* STUDS: Secure to wall with #10 x 3" screws at stud location.
  • Página 5: Important

    STEP 4: STEP 5: MOUNT CABINETS TO THE WALL INSTALL REMAINING CABINETS Shim cabinets square (flat) to the wall so there Drill a 3/16” pilot hole at the stud locations are no gaps between the back of the adjacent through the back panel and into the stud. Make cabinets and wall in mounting area.
  • Página 6 Esta garantía cubre defectos en materiales y mano de obra en sus productos de cocina products to be free of defects in materials and workmanship from the original Hampton Bay bajo uso doméstico normal. Esta garantía se ofrece únicamente al com- prador consumidor residencial original ("el Consumidor") y no puede transferirse.