ENGLISH
1. PARTS AND COMPONENTS
Fig. 1
1.
Drawers
2.
Drawers
3.
Feet
Note:
-
The graphics in this manual are schematic representations and may not exactly match the
product.
-
To make the most out of the freezer in terms of energy, place all the shelves and drawers
in their original position, that is, as shown in figure 1.
2. BEFORE USE
-
This freezer includes a packaging designed to protect it during transport. Take the freezer
out of its box. You can keep the original box and other elements in a safe place, this will
help you prevent product damage when transporting it in the future. In case the original
packaging is disposed of, make sure all packaging materials are recycled accordingly.
-
Make sure all parts and components are included and in good conditions. If there is any
piece missing or not in good condition, immediately contact the Technical Support Service
of Cecotec.
3. INSTALLATION
Preparing for use
-
The location you choose for the freezer must be properly ventilated and away from heat
sources. Do not place the freezer near heat sources, like a cooker, and avoid direct sunlight
to ensure the cooling effect and save on energy consumption. It is not recommended to
place the freezer in a wet place, as it may rust and cause electrical leakage. The result
of dividing the total space of the room in which the freezer is installed by the amount of
refrigerant load in the freezer must not be less than 8 g/m
-
During operation, the freezer releases heat into the environment. Therefore, you should
leave at least 30 mm of free space at the top, more than 100 mm on both sides and more
than 50 mm at the rear of the freezer.
58
.
3
W (mm)
D (mm)
H (mm)
710
770
1855
Fig. 2
Note
Figure 2 only illustrates the space required for the freezer.
Stable surface
Place the freezer on a solid, flat surface to keep it stable, otherwise vibrations and noises will
occur.
Ensure a ventilation free of obstacles around the freezer.
Waiting time
Once the freezer is installed and clean, do not turn it on immediately, wait at least 1 hour before
connecting it to the power supply.
On
-
Connect the plug into a power socket to switch on the freezer. After one hour, open the
freezer compartment door, if the temperature inside the freezer compartment has clearly
dropped, the cooling system is operating normally.
-
Once the freezer is operating and the temperature inside has considerably decreased, you
can introduce food.
-
If the freezer is installed in a wet place, you must check the earthed cord and the leakage
breaker are working normally. If vibration noises occur due to contact of the freezer with
the wall or if the wall turns black due to air convection around the compressor, remove the
freezer from the wall.
-
The installation of the freezer may cause interference in mobile phones, landline phones,
radio receivers or televisions near the refrigerator, so in this case, keep the freezer as far
away from these objects as possible.
4. OPERATION
Fig. 3 Control panel
1.
Temperature indicator
2.
Freezer mode
3.
Fast freeze
4.
Alarm
5.
Temperature increase
6.
Temperature decrease
ENGLISH
A (mm)
B (mm)
C (°)
E (mm)
F (mm)
1297
1407
130±5
50
100
COOLMARKET UF 380 INOX
59