Sunways AT 2700 Instalación página 52

Ocultar thumbs Ver también para AT 2700:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 56
Your Solar Inverter will only start feeding elec-
tricity once the country of installation has been
confirmed.
3 Select «Master» mode.
The other units in the CAN network are auto-
matically configured as slaves.
4 Set the date and time at the main unit.
BG
CS
DE
5 Start the device search from the main unit.
For units from the NT series: The IDs for the
secondary units can be allocated automatically or
manually.
EL
EN
ES
6 For units from the AT series and for manual ID
allocation from the main unit (NT series): Config-
ure networking at the secondary units. Request a
FR
CAN ID at each secondary unit.
IT
NL
7 Change the password, if required.
PT
SL
52
8 Completion of commissioning.
Tabla de contenido
loading

Tabla de contenido