Pressure Testing - Whirlpool W11581317 Hoja De Instrucciones

L.p. kit de conversion a gas propano y butano, conversion de quemadores de gas de 20.000 btu/h de gas natural a petroleo licuado gas embotellado
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Check minimum and maximum inlet gas pressure:
1.
Remove pressure tap plug from valve body using a 3/16" hex
wrench.
A.
Gas Valve Assembly
B.
3/16" Hex Wrench
C.
Pressure Tap Plug
2. Insert pressure tap and finger-tighten. Remove view hole plug
from side panel.
A.
Pressure Tap
B.
View Hole Plug

Pressure Testing

3.
Connect a airtight hose to pressure tap and run the hose
through the view hole on the right side panel. Connect other
end of hose to manometer (airtight hose will attach between
pressure tap and manometer)
NOTE: Be sure to replace all parts a panels, and to reconnect all
wire leads and connections that were disconnected during
disassembly of dryer.
4.
Turn on and zero manometer.
13
A.
Manometer
A.
Manometer
B.
Front Panel
Tabla de contenido
loading

Tabla de contenido