Kohler Anthem K-28209-NA Instrucciones De Instalación página 14

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7. Installation Checkout
Digital
Control
Ports
Jumper
Digital
Control
Ports
Digital
Control
Test for Leaks Without a Digital Control
Disconnect the power from the valve.
Unthread the screw to remove the cover.
Connect the jumper cable to the digital control port, then reconnect the power.
Wait 10 seconds for the valve to restart and the outlets to activate.
Check all connections for leaks.
Disconnect the power. Remove the jumper cable.
Replace the cover. Secure with the screw.
Reconnect the power to the valve.
Test for Proper Operation (Requires an Installed Digital Control)
NOTE: For more information about using the digital control, refer to the digital control Homeowners Guide.
Use the digital control to turn ON the water outlets.
Check for leaks and make adjustments as needed.
Exercise the Valve (Requires an Installed Digital Control)
NOTE: Recently installed or infrequently used valves should be exercised before setting the maximum temperature.
1430527-2-A
14
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

Anthem k-28209

Tabla de contenido