Set-Up And Operation - Denios SPILLGUARD CONNECT Manual De Instrucciones

Ocultar thumbs Ver también para SPILLGUARD CONNECT:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Now create an account and read through
3.
the General Terms and Conditions as well
as the Privacy Policy.
Sign Up
•••••••••
DENIOS AG
Dehmer Straße 58-66
By signing up, you agree to
our terms of service
SIGN UP
Following successful registration, the
4.
SpillGuard® connect web application
opens automatically
22/48
3.4. Activating and configuring
SpillGuard® connect
Press the button „Activate device"
1.
+
Activate device
Complete all the data fields.
2.
Notice:
The more complete your data, the more
efficiently and specifically the information
will be transmitted in the event of an
emergency!
Click „Save" to save your data
3.

4. Set-up and operation

4.1. Switching on and calibrating
SpillGuard® connect
Position SpillGuard® connect at the lowest
1.
point of the spill sump with the sensor
surface towards the bottom.
Press and hold the Push button until the
2.
beep sounds.
1 beep
LED flashes quickly
LED
The calibration process is complete after
3.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® connect is ready for
operation.
4.2. Calibration for a new location
When installing SpillGuard® connect in a new
location proceed as follows:
Press and hold the button until the beep
1.
is heard to switch off SpillGuard® connect.
1 beep
Position SpillGuard® connect in the new
2.
location.
Press and hold the button until the beep
3.
is heard.
1 beep
LED flashes quickly
LED
The calibration process is complete after
4.
approx. 30 seconds.
2 beeps
LED flashes once a minute
LED
SpillGuard® connect is ready for
operation.
SpillGuard® connect Quick Guide | 276016 | Rev. 1
23/48
Tabla de contenido
loading

Tabla de contenido