10 Commissioning
MPS
stations are generally shipped:
•
Fully assembled
•
Individually adjusted and ready for use
•
Pre-commissioned
•
Tested
Note
When stations are combined, the mechanical setup as well as sensor positions and settings may
have to be changed.
Commissioning is normally limited to visual inspection in order to ensure correct tubing connections, wiring
and operating voltage supply.
All components, tubing connections and cabling are clearly identified so that all of the connections can be
readily restored as required.
10.1 Workstation
You'll need the following in order to commission the MPS
•
The assembled and adjusted MPS
•
A control console
•
A PLC board with 16 digital inputs and outputs
•
A power supply unit: 24 V DC, 4.5 A
•
Compressed air supply: 600 kPa (6 bar)
•
A PC with installed PLC programming software
•
Two I/O cables (SysLink)
© Festo Didactic 8038803
station with the sample programs:
®
station
Separating station