Operation; Recommissioning; Saving And Loading A Configuration File - SMA INVERTER MANAGER Instrucciones De Instalación

Ocultar thumbs Ver también para INVERTER MANAGER:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

5  LCS-Tool

5.2 Operation

Figure 18: Recommissioning / Save (A) and Load (B)

5.2.1 Recommissioning

After commissioning is completed by entering the SMA Grid
Guard codes, it is possible to restart operation of the
Inverter Manager.
Procedure:
INFORMATION
Pressing the [recommissioning] button
automatically logs out the user who is currently
logged in.
Procedure:
1. Open the LCS-Tool.
2. Log in as an Installer.
3. Open the Setup > General menu.
4. Select the [recommissioning] button.
28
IMVIOBOX-IA-xx-19
5.2.2 Saving and Loading a
Configuration File
After commissioning is completed by entering the SMA Grid
Guard codes, it is possible to save the configuration of the
Inverter Manager in a configuration file. This configuration
file can be loaded again at a later time. Loading the
configuration file restores the configuration state of the
Inverter Manager after commissioning.
Procedure:
1. Open the LCS-Tool.
2. Log in as an Installer.
3. Open the Setup > General menu.
4. To save the configuration of the Inverter Manager,
select the button (A).
5. To load the configuration of the Inverter Manager,
select the button (B).
SMA Solar Technology AG
Installation Manual
Tabla de contenido
loading

Tabla de contenido