FALMEC Design Altair 60 Manual De Instrucciones página 28

Ocultar thumbs Ver también para Design Altair 60:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
ASSEMBLY INSTRUCTIONS OF ALTAIR/MIRA ISLAND
Phase 1
- Due to packaging and transport requirements, the hood is provided with
an extension and trellis assembled in the hood. Before proceeding with the
installation: remove panel (AP), metal filters (F), loosen screws (V4) and re-
move the trellis (C-C1) with the extension (P). Separate the extension from
the flange (SP), by loosening the screws (V3). See fig. 7.
- Detect the desired height (X is normally 65 cm, see sec. C) to place the hood
(fig. 8).
- Scroll trellises (C) and (C1) until reaching the desired height (H2); subse-
quently, block them with 8 self-threaded screws (V2) (fig. 8).
- Fasten the trellis (C) and flange (SP) to the ceiling, using 8 Fischer Ø 8 and
relative screws (V1) (Fig. 9).
- In case of false ceiling, the flange (SP) can be fastened at the level of the false
ceiling (fig. 10).
Phase 2
- In case of exhaust version: detect the optimal height of the elbow shaped or
flexible tube of fume discharge (F) and connect it to the motor fitting (fig. 11).
- Insert the extension on the hood and lift the assembly, hooking it to the 4 M5
metric screws (V4), which are pre-screwed to the trellis (C) (centre the Ø11
holes to the slot of the interchamber and move it sideways) (fig. 11). Fasten
the 4 M5 screws permanently (V4).
- Connect the tube (F) to the discharge hole of the ceiling (in case of exhaust
version). See fig. 12.
- Carry out electric connection only after having disconnected the electric po-
wer supply.
- Lift the extension and fasten it to the flange (SP) 4 M4 metric screws (V3).
See fig. 13.
Phase 3
- Re-assemble the metal filters and panel (AP) and power the hood complying
with the regulations in force.
26
Tabla de contenido
loading

Tabla de contenido