Out-Of-Deck/Planter Box Installation - Jandy JLLED4C Serie Manual De Instalación Y Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Page 8
ENGLISH
4.
Plumb the incoming filtered water supply to the
1 inch (25.4 mm) hub located on the side of the
deck canister marked "Inlet". The filtered water
supply must include a check valve.
5.
Plumb the conduit for the fiber LED cable to the
3/4 inch (19 mm) socket located either side of the
deck canister marked "Electrical". Refer to fiber
optic installation instructions.
1" (25.4 mm)
Water Inlet
3/4" (19 mm)
Electrical Inlet (Optional)
1" (25.4 mm) Stake-Up
Socket Feature
Figure 6. Deck Canister - Bottom View
NOTE: Use one (1) of the two (2) electrical inlets,
located on either side of the deck canister,
which are provided for installation ease.
6.
Plumb in the 1½ inch (38 mm) drain line.
Adequate drainage must be provided for the deck
canister.
NOTE: Proper drainage for the deck canister is critical
to avoid damage to the laminar jet assembly.
7.
Verify the deck canister is level.
8.
Place the adjustable deck lid collar back on the
canister. This collar allows the installer to make
fine adjustments when leveling the canister to
be flush with the deck's finished surface. Set the
collar at the finished deck level and pour the deck.
3.2

Out-of-Deck/Planter Box Installation

CAUTION
Do not install the Jandy Laminar Jet deck
canister in an area prone to run-off or flooding
or on a flammable surface.
Jandy
Laminar Jet | Installation and Operation Manual
®
NOTE: The deck canister lid can only rotate
1.
1-1/2" (38 mm)
NOTE: Proper drainage for the deck canister is critical
Drain Port
2.
NOTE: To ensure that the canister stays upright while
3/4" (19 mm)
Electrical Inlet
(Optional)
3.
NOTE: Unlike the in-deck installation, the deck canister
4.
5.
6.
7.
8.
9.
approximately 90 degrees to the left or the right.
Therefore, make sure that the deck canister is
positioned towards the desired target location
prior to completing the installation.
Dig the hole for the deck canister approximately
24 inches deep and 18 inches in diameter (60 cm
deep, 45 cm diameter). This will ensure enough
room for positioning the canister and laying out the
plumbing. The dimensions allow for the addition
of a layer of pea gravel, about 1/8 to 1/4" size
(3-6 mm), for drainage, as well as room to pour
concrete around the outside of the canister for
stability.
to avoid damage to the laminar jet assembly.
Lift up the lid and jet assembly and adjustable
deck lid collar from the deck canister.
installing and leveling the unit, place a 6 inch
(15 cm) length of 1 inch (25.4 mm) PVC pipe
in the stake-up socket feature located on the
bottom of the canister.
Set the deck canister in the hole. The canister
should be approximately 1½-2 inches (38-50 mm)
above the finished grade in the planter.
cover cannot be flush with the finished grade.
It must sit slightly above the surface to prevent
water and debris from seeping into the canister.
Level the deck canister. To hold the canister in
place, position a 6 inch piece (15 cm) of 1 inch
(25.4 mm) PVC pipe in the construction support
socket located on the bottom of the canister.
Plumb the incoming, filtered water supply to the
1 inch (25.4 mm) hub located on the bottom of the
deck canister marked "Inlet". The filtered water
supply must include a check valve.
Plumb the conduit for the fiber/LED cable to the
1 inch (25.4 mm) hub located on the bottom of the
deck canister marked "Electrical". Refer to fiber
optic installation instructions.
Plumb in the 1½ inch (38 mm) drain line located
on the bottom of the deck canister. Adequate
drainage must be provided for the canister.
Fill in the hole surrounding the deck canister with
concrete or suitable backfill material for stability
in the ground.
Place the adjustable deck lid collar back on the
canister.
Tabla de contenido
loading

Este manual también es adecuado para:

Jlfbr serie

Tabla de contenido