All manuals and user guides at all-guides.com
1
2
3
4
3
4
6
5
2
1
5
6
2
Commissioning
2.1
Preparatory checks
•
Check wiring according to the plant connection
diagram
•
Ensure that installation of plant is completed
2.2
Turn power on
If there is no display:
• Bus receives no power
• Wiring is disrupted, connections are mixed up
• Room unit is not correctly engaged in the base
4
74 319 0328 0 a - B1633
CE+
Konnex TP1 *
CE-
Konnex TP1 *
-
-
-
-
-
-
-
-
* Not interchangeable
Installation Instructions