Unpacking Precautions; Delivery Inspection; Shipment Contents - Briggs & Stratton 076180 Manual De Instalación Y Arranque

Sistemas de generador de reserva
Ocultar thumbs Ver también para 076180:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Unpacking Precautions

The unit is shipped ready for installation on a prepared
reinforced cement slab or engineered base. Avoid
damage from dropping, bumping, collision, etc. Store and
unpack carton with the proper side up, as noted on the
shipping carton.

Delivery Inspection

After removing the carton, carefully inspect the generator for
any damage that may have occurred during shipment.
If loss or damage is noted at time of delivery, have the
person(s) making delivery note all damage on the freight
bill and affix his signature under the consignor's memo of
loss or damage. If loss or damage is noted after delivery,
separate the damaged materials and contact the carrier
for claim procedures. Missing or damaged parts are
not warranted.

Shipment Contents

The standby generator system is supplied with:
• Fully-serviced coolant system
• Fully-serviced oil/lubricating system
• Synthetic oil (5W30)
• Flexible fuel line
• Installation and start-up manual
• Operator's manual
• Spare access roof and door keys
• Spare 15 Amp ATO-type fuse
• Coolant
• Touch up paint
Not Supplied:
• Carbon monoxide detector(s)
• Smoke detector(s)
• Starting battery
• Reinforced concrete pad
• Connecting wire and conduit
• Fuel supply valves/plumbing
• Two 60" lengths of 2" Schedule 40 pipe (NOT conduit)
• Crane, lifting straps, chains or cables, spreader bar
• Torque screwdriver, 5 to 50 inch-pound range
• Voltage/frequency meter
• Various special tools and equipment
8
BRIGGSandSTRATTON.COM
Tabla de contenido
loading

Tabla de contenido