INTEGRAL POWER II
Pass the cabling through the borehole (T)
5
made for this purpose in the roof (figure 1).
Position Integral Power II (A) with (6) 13 mm
pieces of bushing, rubber washers and (6)
M6/100x40 screws (B) and nuts M6/100.
Important: Ensure sealtightness between the
!
unit and the ceiling in order to prevent any
water coming in.
Insert rubber washers to prevent water
6A
passage.
5
A
6A
13
B
C
M6/100 nut
flat washer
rubber washer
unit base
bushing
vehicle roof
flat washer
screw M6/100
EN
5