Bergstrom INTEGRAL POWER II Instrucciones De Montaje página 11

Ocultar thumbs Ver también para INTEGRAL POWER II:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

INTEGRAL POWER II
Position the Integral Power II unit on the roof,
1
taking into account that the final position must
correspond to the front supplied, ensuring it
is on a flat surface.
Once the position is defined, remove the case
2
and mark (6) boreholes (Y), then align the (4)
template boreholes with the (4) rear boreholes
in the roof (figure 3).
Note the arrow indicating the operation
direction.
620 mm
585 mm
T
Y
11
EN
C
1
Tabla de contenido
loading

Tabla de contenido