Installation And Start-Up - Glatz SUNWING Casa Manual De Instrucciones

Ocultar thumbs Ver también para SUNWING Casa:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22

Installation and start-up

1
2
3
Unpacking the parasol
Supplied with:
- Parasol
- Crank (2x)
- Binding (only for material class 5)
- Protective cover
- Operating instructions
!
Dispose of packaging material prop-
erly and keep away from children.
Do not make use of defective ma-
terial. In the event of any damage,
inform the transport service provider
immediately.
Placing the parasol down
!
Carefully place the parasol on a
clean, horizontal surface. The parasol
is very heavy. Work in a threesome
and hold the parasol securely.
Prepare the floor fastening
Place the floor fastening in accordance
with the separate instructions.
Size
Base weight
Wind speed*
[cm]
[kg]
[km/h (Bft.)]
ø 300
90
35 (5)
ø 330
90
30 (5)
300 x 240
90
35 (5)
270 x 270
90
30 (5)
* maximal wind speed with fixed ground
anchorage
26
27
4
Pre-assemble parasol
1. Put the cranks in place and
screw tightly.
5
Place shade
1. Put the pole up and place it into its
anchorage system (ground socket/
base).
Tabla de contenido
loading

Tabla de contenido