ICEMAKER INSTALLATION INSTRUCTIONS
14
WATER VALVE INSTALLED
Refer to the Water Line Installation Instructions
for connection to the home water supply. After
water line installation is completed, set the
icemaker power switch to I (on).
The icemaking cycle will not begin until the icemaker
and freezer compartment reach operating temperature,
then icemaking will begin automatically.
15
ATTACH WARRANTY LABEL
A label is provided with this kit to record the date
of installation for warranty purposes. Apply it to the
back of the refrigerator. The icemaker installation
inside the freezer is now complete.
Installation Instructions
16
(CONT.)