Switching on the meter
Setting the language
Setting the date and
ba75506edfs03
11/2017
Turbidity \ Calibration
i Insert standard
1000 FNU/NTU
i Press and hold <START>
i Align sample

Initial commissioning

Press the <ON/OFF> key.
The English language is set on delivery. Set a different language as
follows:
1
Open the Configuration menu with the <MENU> key.
2
Open the Configuration / System / Language menu with the
<
?
> <
3
Select the required language with the <
confirm with <START/ENTER>.
4
Quit the menu with the <M> key.
The date and time are set in the menu,
time
Configuration / System / Continue ... / Date/time.

Operation

Inserting a cell
To be able to insert cells in the Turb 430 IR/T, the cell shaft has to be
prepared to take in a cell.
1
Push the dust cover (1) upward.
The cell shaft for 28 mm cells is open.
?
> and <START/ENTER> keys.
Initial commissioning
The i indicates
info texts, e.g.
messages, notes or
instructions
?
> <
?
> keys and