76
AVENTICS | SERCOS III | R412012610–BDL–001–AB
Commissioning and Operation
7.2
Configuring the bus coupler network
The configuration steps laid out in this section are superior to
the settings on the bus coupler which have already been
described (see "Making presettings" on page 69) and are a part
of the entire system's bus master configuration.
The work being described here may only be carried out by
qualified electronics personnel and in compliance with the
operator's documentation on configuring the bus master as
well as applicable technical standards, directives, and
safety regulations.
Before starting configuration, the following steps must have
been carried out and completed:
W
You have assembled the bus coupler and the valve terminal
(see "Assembly" on page 61).
W
You have connected the bus coupler (see "Connecting the
bus coupler electrically" on page 62).
W
You have carried out the presettings (see "Making
presettings" on page 69).
Configuration error
An incorrectly configured bus coupler can lead to
malfunctions in the system and may damage the system.
O
The configuration may therefore only be carried out by
qualified electronics personnel!
NOTICE