English
Removing the Elbow
1
Shut off the engine.
N
Press down the lock button (1) by
N
inserting a suitable tool through the
opening.
Rotate the union nut (1) in the
N
direction of arrow as far as the stop.
Remove the elbow (2).
N
Removing the Suction Tube
2
1
Shut off the engine.
N
Press down the lock button (1) by
N
inserting a suitable tool through the
opening.
Depress lever (1) and rotate handle
N
(2) in direction of arrow as far as the
stop.
Remove the handle together with
N
the suction tube.
30
2
5
Position the intake screen (3) on the
N
intake opening.
Line up the arrows (4).
N
Rotate the intake screen (3) in
N
direction of arrow until the lug (5)
engages audibly on the blower
housing.
Lock button (arrow) must engage in
position.
4
BGE 61, BGE 71, BGE 81, SHE 71, SHE 81
Connecting to Power Supply
The voltage and frequency of the
machine (see rating plate) must match
the voltage and frequency of the power
connection.
The minimum fuse protection of the
power connection must comply with the
specifications – see "Specifications".
The machine must be connected to the
power supply via an earth-leakage
circuit breaker to disconnect the power
supply if the differential current to earth
exceeds 30 mA.
The power connection must correspond
to IEC 60364 and relevant national
regulations.
Extension cord
The design of the extension cord must at
least fulfill the same features as the
connecting cord on the machine.
Observe the design marking (type
designation) on the connecting cord.
The cores in the cord must have the
following minimum cross-section
depending on the mains voltage and
cord length.
Cord length
Minimum cross-
section
220 V – 240 V:
Up to 20 m
1.5 mm
20 m to 50 m
2.5 mm
100 V – 127 V:
Up to 10 m
AWG 14 / 2.0 mm
10 m to 30 m
AWG 12 / 3.5 mm
2
2
2
2