Complete The Installation - Kohler K-9393 Guia De Instalacion

Receptor de ducha con tapa desmontable
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Install the Finished Wall
IMPORTANT! If the shower receptor is adjacent to vertical ducts or wiring, the shower receptor must be
surrounded with fire-rated, water-resistant wall material.
Install the wallboard with the factory edge (the paperbound edge) a minimum of 5/8" (15 mm)
above the finished, nailing-in flange threshold of the shower receptor.
Apply silicone sealant to the upper portion of the nailing-in flange where it will meet the
water-resistant wall material.
Mud, tape, and finish the wallboard.
Seal the joints between the receptor rim and the finished wall with silicone sealant.

6. Complete the Installation

NOTE: Refer to the sealant and/or putty manufacturer's instructions for proper application techniques.
Seal around the valving and outlets with silicone sealant or plumbers putty.
Install the shower door according to the manufacturer's instructions.
Install the finished floor.
Apply silicone sealant along the front edge of the receptor where it meets the floor.
Place the removable cover in the recessed area around the drain. Lightly push down on the
removable cover to secure the suction cups to the receptor.
Kohler Co.
Finished Wall
Check walls for plumb.
Paperboard
Edge Down
Nailing-In Flange
Threshold
Removable Cover
7
Wallboard
Furring Strip
5/8"
(1.6 cm)
2x4 Framing
Min
Galvanized
Screw/Nail
Silicone Sealant
1064933-2-D
Tabla de contenido
loading

Este manual también es adecuado para:

K-9394K-9395K-9396K-9397K-9479

Tabla de contenido