Complete The Installation - Kohler K-97630-NY Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6. Complete the Installation

Finished Wall
IMPORTANT! To ensure a successful installation, allow the construction adhesive to cure 24 to 48 hours before installing
the finished wall material. Do not remove the 2x4 bracing until the construction adhesive has fully cured.
Remove the 2x4 bracing from the rough wall once the construction adhesive on the locker unit has fully cured.
Install the finished wall material up to the edges of the locker unit.
Apply color-matched 100% silicone sealant around the entire locker unit.
NOTE: Wait 24 hours before showering or running water.
Prepare the shelves with accessories.
TIP: When preparing the two shelves, use water and soap to guide the hook and basket into the shelves with ease.
Press the hook into the shelf as shown above.
Press the basket into the shelf as shown above.
Install the shelves into the locker unit.
Kohler Co.
9
1484883-2-A
Tabla de contenido
loading

Este manual también es adecuado para:

K-97630-0K-97631-0

Tabla de contenido