KIT 12 (code 778150) (optional)
TO CHANNEL HOT AIR INTO AN ADJACENT ROOM
IN ADDITION TO THAT OF INSTALLATION
Includes:
a
Box
b
Ø 8 pipe
c
Smoke outlet end-piece
g
Pipe blocking clamp
NOTE:
THE FIRST PART OF THE FLEXIBLE PIPE MUST BE
COMPLETELY "RELAXED" IN SUCH AWAY TO ELI-
MINATE CORRUGATION. IN THIS WAY, THE INTER-
NAL DIAMETER WILL BE SLIGHTLY ENLARGED TO
FAVOUR ENTRANCE.
Procedure:
- De ne the position of the stove with respect to the walling
( g. a).
- Place the stove in its de nite position.
- Extend the aluminium pipe (b) for hot air channelling, wi-
thout connecting the stove outlet.
- Fit the alluminium pipe to the hot air oulet on the back of the
stove ( g.C) and fasten it by its blocking clamp (g)
- Install the terminal outlet (c) to the end of the alluminum pipe
by its blocking clamp (g) ( g. c) in the room to heat
HOT-AIR DUCTWORK
n° 1
n° 1
n° 1
n° 2
- 30
-
a
c
b
g
g. a
b
d
g. b
e
8
d
g. c
g
c
g
f
e
g
c 8
d
b
e
d
f
e