Tecno-gaz Ekstraplus PT001TTM Instrucciones De Uso página 56

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
The device can host:
Stations 1 and 2
Handpiece
(ISO 3964 E-Type coupling)
Fig. 21
The LUBRICATION phase involves:
Handpiece central channel
The DISINFECTION/CLEANING phase involves:
Spray/water channel
Handpiece central channel
22
Stations 3 and 4
Turbine with MIDWEST-type quick adapter
(ISO 9168 Type B/C)
2. Turbine actuating air
4. Drain
1. Water
2. Actuating air
3. Spray air
4. Drain
5
4
3
1
ISO 9168 Type B
Channels:
1) Water
2) Actuating air
3) Spray air
4) Drain
5) Fibre optic
6) Electrical connection
Fig. 22
6
2
4
3
1
ISO 9168 Type C
2
Tabla de contenido
loading

Tabla de contenido