7.5
Connection and type of instruments
Maintenance is performed on handpieces and turbines inside the chamber.
They must be connected correctly as described below.
Door gasket
HANDPIECE stations
Fig. 19
HANDPIECE release button
HANDPIECE interlock
Defining O-ring of the
Spray/water channels
Fig. 20
ENGLISH
TURBINE stations
Chamber drain
Fig. 21
Screw connection for
TURBINE quick coupling
21