Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
POSITIONING OF THE FRONT FIXATION
Once the operator has been mounted on the back fixation close the leaf and do as follows:
1) Release the operator (as in Fig. 33)
2) Pull out completely the chromium plated rod, afterwards bring it back about 1 cm
3) Fix the rod on the front fixation (Fig. 14)
4) Position the operator perfectly horizontal and mark the position of the front fixation (Fig. 13).
Attention: Avoid the welding of the front fixation to the rod of the hydraulic operator already fixed as the
welding residual (squirt) could ruin the chromium -plating of the rod.
Fig. 12
Fig. 13
WELDING OF THE FRONT FIXATION TO THE GATE
Mount the front fixation so that it guarantees the perfectly horizontal position of the operator.
Depending on the type of the gate (wood, iron, aluminium) the front fixation can be welded or
screwed
Srewed front fixation
70* mm
46 mm
Fig. 15
67410873
®
Plastic frame
Back disc
Welded front fixation
70* mm
Fig. 16
REV 05 - 12/2012
HALF TANK
ELECTROHYDRAULIC
English
English
Before inserting the ball joint,
insert the disc and the frame
as in Fig.12.
N.B.:
The mechanical/electronic
stop must be mounted after
having installed the operator
on the gate.
* For HT 270 version
For HT 390 101 mm
Fig. 14
23