M-15-25
LIFT CORPORATION Sht. 8 of 58 DSG#
Rev. E Date: 08/13/19
PREPARE LIFTGATE - Continued
REMOVE KNOCKOUTS
4. Verify which knockouts to remove from the
bottom of main frame housing (FIG. 8-1).
Then, remove the knockouts as needed.
KNOCKOUTS
MAIN FRAME
REMOVING KNOCKOUTS FROM
MAIN FRAME HOUSING
FIG. 8-1