VMB TE-063 Manual De Instrucciones página 11

Torre elevadora
Idiomas disponibles

Idiomas disponibles

1
N
le before starting to lower the next.
CAUTION:
THERE IS NO NEED TO PULL
THE ALS LOCKS HARD.
holding all the weight, If you pull too hard
4.10 - Transport:
For the transport of the tower is necessary
completely. Once the towerlift is completely
folded, place the legs in their transport com-
partment (S) and tighten the legs with the
K), then the lift will be ready
to be transported.
5. MAINTENANCE.
5.1 -
it should be changed and replaced immedia-
tely with a new one. Do not use the lift if the
cables are in bad condition. Only use VMB
steel cables reference: DIN 3060 torsion re-
sistant.
PRO LIFTS S.L.
ENGLISH
5.2 - The lift is supplied from the factory
-
completely greased. However, it is recom-
mended to periodically grease according
2
)
to use, the gearing, the axis bearings, the
N
-
5.3 - All lifts should undergo an annual te-
chnical inspection carried out by an autho-
and general condition of all the
lift's elements and security systems invol-
ved in the lift's use.
5.4 - Only use original spare parts to gua-
rantee a continued security level. The user
loses all rights to warranty if any spare
parts other than originals are used or ca-
the towerlift.
5.5 - To request a spare part please indi-
cate the corresponding code which can be
found in this manual together with the lift's
serial number and year of manufacture.
6. GUARANTEE.
The warranty period for this lift is 2 years
from the date of purchase.
PRO LIFTS S.L. promises, that from the
-
date of purchase and during the warranty
period to resolve any faults that may occur,
produced through defect material or fabri-
cation. Damage caused by improper use,
this warranty.
Depósito legal y copyright. Todos los derechos reservados.
-
11
loading